Education

Ready when the students come back.

Educational facilities run on a calendar, and so does the work. McAllister paints classrooms, corridors, gyms and cafeterias over breaks and after hours, coats corridor and shop floors, and hands the building back clean on the date the school set. Recent work includes 250,000 square feet of walls, doors and ceilings at Troy Elementary School in 8 weeks.

  • Summer, holiday and after-hours scheduling
  • Durable, cleanable finishes for high-traffic walls
  • Wallpaper removal and level 5 drywall
  • Floor coatings for corridors, labs and shops
Hallway at Troy Elementary School with colorful painted doors

Facilities

Education facilities we work in.

Each facility type has its own page with the surfaces, schedule and services that apply.

  • Child Care Facilities

    Child care centers need finishes that are safe, washable and bright, applied when the children are not in the building.

  • Locker Rooms

    Locker rooms are wet, humid and hard on finishes, so the products and the preparation have to be chosen for constant moisture.

  • Troy Elementary School gym with protected floors during the interior repaint

    Schools

    Schools are repainted around the calendar: summer break, holidays and after hours, with the building ready when students return.

  • Science lab classroom with red accent walls and striping at D.A. Smith Middle School

    Universities and Colleges

    Campuses have everything from lecture halls and labs to dormitories and athletic facilities, usually on a tight summer schedule.

How we approach it

A firm date, a clear sequence, a clean handover.

School projects are won or lost on the schedule. McAllister sets the sequence building by building and wing by wing, brings the crew size the window demands, and checks each area before it is released so there is nothing left for the first day of class.

Products are chosen for the way students use a building: scrubbable walls, durable doors and trim, and floor coatings that take daily traffic and cleaning. On GC projects the specification and finish schedule govern, and submittals go in before any paint is ordered.

Services

Most often scoped for education.

All services
  • Open office floor with new paint, wood-look flooring and built-in work stations

    Commercial & Industrial Painting

    Interior and exterior painting for warehouses, plants, schools, retail and offices, scheduled around your operation and delivered to the specification, as a subcontractor or direct.

  • Upper floor of the healthcare lobby with painted walls and a feature window

    Drywall

    Drywall hanging, taping, finishing and repair for commercial interiors, coordinated with our framing and painting so the general contractor deals with one sub.

  • Exposed metal deck and structure sprayed with black dryfall coating

    Ceilings & Grid Systems

    Suspended acoustical ceiling grid and tile installed, replaced or repaired, and exposed structure painted, for offices, schools, retail and tenant improvements, coordinated with the trades above the ceiling.

Related projects

McAllister work in education.

All projects
  • Troy Elementary School gym with protected floors during the interior repaint
    McAllister projectCommercial & industrial paintingSchools & education

    Troy Elementary School interior painting

    250,000 square feet of walls, doors and ceilings painted in 8 weeks. The project also included wallpaper removal and refinishing drywall to a level 5 finish before paint.

  • Science lab classroom with red accent walls and striping at D.A. Smith Middle School
    McAllister projectCommercial & industrial paintingSchools & education

    D.A. Smith science lab, wall and ceiling coatings

    Completed for Wyatt Sasser Construction. The project included wall and ceiling coatings, red and white accent striping in the labs, and an exterior concrete sealant.

  • Decorative flake resinous floor coating at Linden High School
    McAllister projectFloor coatingsSchools & education

    Linden High School concrete floor coating

    Concrete floor coatings completed with a resinous base at Linden High School in Linden, Alabama.

  • Gymnasium in Kinston, Alabama, with painted walls and a coated court floor
    McAllister projectCommercial & industrial paintingSchools & education

    Gym painting, Kinston, AL

    Gymnasium walls and structure painted in Kinston, Alabama.

Questions

Education questions.

Still have a question? The office is open Monday to Friday, 7 AM to 5 PM.

Can you work while the education facility stays open?

Usually, yes. Most projects are phased or scheduled after hours so the facility keeps operating. The sequence, access and containment are agreed before the crew arrives.

Do you work for general contractors or directly for owners?

Both. McAllister bids and carries the Division 9 finish scope for general contractors, and works directly for owners and facility managers on existing buildings.

Where do you take on this work?

McAllister is based in Slocomb, Alabama and works across Alabama, Florida, Georgia, Mississippi and Tennessee. Send the location and scope with your quote request and we will confirm whether it fits our schedule.

Have a education project?

Tell us about the facility, the scope and how it operates. We will come back with the approach, the schedule and a clear quote.

Monday to Friday, 7 AM to 5 PM. Call (334) 258-9990

McAllister projectCommercial & industrial paintingSchools & education

250,000 square feet of walls, doors and ceilings painted in 8 weeks. The project also included wallpaper removal and refinishing drywall to a level 5 finish before paint.

Scope

  • 250,000 sq ft of walls, doors and ceilings
  • Completed in 8 weeks
  • Wallpaper removal
  • Drywall refinished to level 5
McAllister projectCommercial & industrial paintingSchools & education

Completed for Wyatt Sasser Construction. The project included wall and ceiling coatings, red and white accent striping in the labs, and an exterior concrete sealant.

Scope

  • Wall and ceiling coatings
  • Accent walls and striping
  • Exterior concrete sealant
  • Completed for Wyatt Sasser Construction
Decorative flake resinous floor coating at Linden High School
McAllister projectFloor coatingsSchools & education

Concrete floor coatings completed with a resinous base at Linden High School in Linden, Alabama.

Scope

  • Resinous base coat
  • Decorative flake floor coating
McAllister projectCommercial & industrial paintingSchools & education

Gymnasium walls and structure painted in Kinston, Alabama.

Scope

  • Gymnasium walls and structure